- 計(jì)劃工作預(yù)算費(fèi)用(Budgeted Cost Of Work Scheduled)
- 計(jì)劃工程投資額(Budgeted Cost Of Work Scheduled)
英漢例句
- It's brought forward an EVM evaluation method with critical path to hold the project progress well through comparing with BCWP and BCWS also with BCWP CP and BCWS CP in critical path at the same time.
本文提出了一種帶關(guān)鍵路徑的掙值法評(píng)價(jià)方法,在比較分析BCWP與BCWS的同時(shí)對(duì)關(guān)鍵路徑上的BCWP與BCWS作比較,以便更準(zhǔn)確地把握項(xiàng)目進(jìn)度情況。
雙語例句
詞組短語
- BCWP -BCWS 進(jìn)度偏差
- BCWS Budgeted Cost of 已排定工作的預(yù)
- BCWS Budgeted Cost of Scheduled 計(jì)劃執(zhí)行預(yù)算成本
- Budgeted Cost of Work Scheduled -BCWS 計(jì)劃工作預(yù)算成本
- Budgeted Cost for Work Scheduled -BCWS 計(jì)劃工作的預(yù)算費(fèi)用