load dump test
基本解釋
- 甩負(fù)荷試驗(yàn)
英漢例句
- Load dump anticipation(LDA) function are one of the important steps to ensure the success of the steam turbine load dump test, and this circumstance is vary rare.
甩負(fù)荷預(yù)測(cè)功能是確保機(jī)組成功進(jìn)行甩負(fù)荷的一項(xiàng)重要措施,大型汽輪機(jī)組中發(fā)生該功能失效的情況很少見。 - The DEH system of the back pressure turbine of thermal power plant is presented in detail and the load dump test used the conventional method is developed successfully.
以某熱電廠背壓式汽輪機(jī)數(shù)字電液調(diào)節(jié)系統(tǒng)(DEH)為例,介紹了該機(jī)組DEH系統(tǒng)的構(gòu)成、特點(diǎn)以及機(jī)組DEH改造后采用常規(guī)法甩負(fù)荷試驗(yàn)的情況。
雙語(yǔ)例句
詞組短語(yǔ)
- load -dump test -rejection test 甩負(fù)荷試驗(yàn)
- steam turbine load dump test 汽輪機(jī)甩負(fù)荷試驗(yàn)
- study on load dump test 甩負(fù)荷試驗(yàn)研究