restrike
常見(jiàn)例句
- Die should contain a minimum of one idle station to accommodate future design considerations. i.e. restrike cam pierce etc.
摸具應(yīng)至少包含一個(gè)空站以適應(yīng)未來(lái)的設(shè)計(jì)變更,回整,凸輪,沖孔等。 - Die should contain a minimum of one idle station to accommodate future design considerations. i.e. restrike, cam pierce, etc.
所有模具入子耐磨的地方必須使用鑲嵌以方便經(jīng)濟(jì)的維修,置換以及根據(jù)料厚的變化調(diào)整能力。 - In a10kV distribution system,when shunt ca-pacitors are switched off by vacuum circuit breakers,restrike overvoltage often occurs.
電力系統(tǒng)中使用真空斷路器切除無(wú)功補(bǔ)償用并聯(lián)電容器時(shí),容易產(chǎn)生重燃過(guò)電壓,嚴(yán)重影響并聯(lián)電容的安全運(yùn)行。 - Theoretical development and of the blank and simulation of drown and restrike,we need to see the green color in the simulation drow before building the die.It's very important.
在制作模具之前我們理論上應(yīng)該制作一個(gè)白模來(lái)模仿一下沖壓效果來(lái)看看綠顏色的定位。這很重要。 - All dies containing a restrike station should have a parallel under restrike station. Pararllel should have a minimum width to cover entire restrike area.
在有回整工步的地方,必須有一個(gè)墊腳支撐,墊腳最小寬度應(yīng)該覆蓋回整區(qū)域。 - Du Bin, Zhao Feng, Gao Yadong et al.Study of restrike overvoltage when switching off shunt capacitors in a 10kV distribution system[J].High VoltageApparatus, 2004, 40(4): 255-258.
[8]杜斌;趙峰;高亞棟;等.;10kV系統(tǒng)中切除并聯(lián)電容器時(shí)的重燃過(guò)電壓研究[J] 返回 restrike