ultimate pile load
基本解釋
- [機(jī)械工程]樁的極限荷載
英漢例句
- The ultimate bearing load of the pile is used to calculate its buried depth.
根據(jù)樁的極限承載力來(lái)計(jì)算樁的入土深度。 - Non-linear Least Squares Algorithm is used to calculate the parameters in exponent equation, which is used to predict ultimate pile load.
用最優(yōu)化理論中的非線性最小二乘法求解指數(shù)方程中的有關(guān)參數(shù),用指數(shù)方程預(yù)測(cè)基樁極限荷載。 - The direct or indirect method to determine ultimate uplift load of anchored rod pile is proposed herein based on field tests in association with engineering practice.
本文結(jié)合工程實(shí)踐,通過(guò)現(xiàn)場(chǎng)試驗(yàn)分析研究提出錨桿樁抗拔極限荷載直接或間接的確定方法,并提出了合理的施工方案。
雙語(yǔ)例句
專業(yè)釋義
- 樁的極限荷載