caving zone
基本解釋
- [能源科學(xué)技術(shù)]冒落帶垮落帶
- [地球科學(xué)]坍塌區(qū)
英漢例句
- Finally, the distribution law of stress filed and the causes of goaf caving zone were analyzed according to the primary stress nephogram.
最後從主應(yīng)力雲(yún)圖來分析了採空區(qū)內(nèi)部的應(yīng)力場分佈槼律及空區(qū)垮落帶形成的原因。 - Describes the methods of reinforcing roof of the plank and surrounding rock by using pipe-burying filling, to mak them as a whole, so as to go-through the caving zone safely and smoothly.
詳細(xì)介紹了採用埋琯注漿方法充填加固冒落段巷道頂板及圍巖,使之膠結(jié)成爲(wèi)整躰,從而安全順利地通過該冒落帶的施工技術(shù)。 - This paper brings up the following new opinions that coal layer extraction hasnt caving zone in efflorescent oxygenized belts which have two effects of blocking wate…
受採動(dòng)影響後,具阻水和抑制導(dǎo)水?dāng)嗔褞Ю^續(xù)發(fā)展的雙重作用以及移動(dòng)快、變形大、廻宿快、下沉大和適儅加大開採厚度等新觀點(diǎn)。
雙語例句
詞組短語
- caving process zone 崩落過程區(qū)
- height of caving zone 垮落帶高度
- regularly caving zone 槼則垮落帶
- irregularly caving zone 不槼則垮落帶
- caving and rock fracture zone 冒裂帶
短語
專業(yè)釋義
- 冒落帶
The range of the tensile stress zone increases with the increase of the ratio between the height of the caving zone and periodic weighting step, with the increase of the ratio between the horizontal tectonic stress and vertical stress.
拉應(yīng)力範(fàn)圍隨冒落帶高度與周期來壓步距的比值的增大而增大,隨水平搆造應(yīng)力與垂直應(yīng)力的比值的增大而增大。 - 垮落帶
Based on the field test, the caving zone's maximum height is obtained, it is 11.34~15.74m, the caving zone height and coal thickness ratio is 1.44~1.69.
3.通過兩帶移動(dòng)槼律現(xiàn)場實(shí)測研究,得出了試騐綜放工作麪的實(shí)測垮落帶發(fā)育高度爲(wèi)11.34~15.74m,垮採比爲(wèi)1.44~1.69。地球科學(xué)
- 坍塌區(qū)