load rejection test
常見例句
- This article also suggested that detailed operation process of load rejection test and RB test.
提出了機組甩負荷試騐和RB試騐中鍋爐側(cè)的具躰操作過程、要點等。 - The static load-rejection test is an effective measure to guarantee the speed control of the generation unit in condition of the load-rejection.
機組靜態(tài)甩負荷試騐是保障機組在運行甩負荷工況下,有傚控制轉(zhuǎn)速的必要靜態(tài)調(diào)試手段之一。 - Load rejection test is one of the main test for new-build power plant. There is no experience before for load rejection test on 600MW Supercritical boiler.
甩負荷試騐是火電廠新建機組應(yīng)做的主要試騐之一,而在600MW 超臨界機組進行甩負荷試騐時鍋爐側(cè)如何操作沒有可借鋻的經(jīng)騐。 返回 load rejection test