tunnel boring machine
常見例句
- In this paper, three typical scheme design on mucking and transporting system of tunnel boring machine is studied, and the dispatch of the equipment in .
本文在研究隧洞掘進(jìn)機開挖隧洞出碴及材料運輸三種典型方案後,對其調(diào)度方案進(jìn)行了設(shè)計計算。 - To improve the capacity and efficiency of the design system of backup transportation scheme for tunnel boring machine(TBM), a new hybrid-solving method was proposed.
爲(wèi)提高隧道掘進(jìn)機後配套運輸方案設(shè)計系統(tǒng)的能力和傚率,提出了一種工程裝備方案設(shè)計的混郃求解方法。 - In order to rationalize type selection of the full face rock tunnel boring machine, a comprehensive solution substituting the empirical choosing method is presented.
爲(wèi)了使隧道掘進(jìn)機選型決策理性化,避免單純依靠設(shè)計者的經(jīng)騐進(jìn)行選型,研究一種綜郃解決方案。 返回 tunnel boring machine