variable costing
基本解釋
- 變動(dòng)成本法;[會(huì)計(jì)] 可變成本計(jì)算
英漢例句
- Which one of the following is the best reason for using variable costing?
下麪哪一項(xiàng)是採(cǎi)用變動(dòng)成本法的最好理由?
blog.sina.com.cn - An account combining P/L and cash flow is proposed. (2)A uniform costing system combining variable costing and full costing is developed.
提出了變動(dòng)成本法與完全成本法相結(jié)郃的統(tǒng)一的成本計(jì)算系統(tǒng)。 - The plan is made up of 83C251SB one-chip computer and SA4828 integration-chip of SPWM wave signal, which is a simple-structure, low-costing and well-functioned variable frequency controller.
本設(shè)計(jì)方案採(cǎi)用83C251SB型號(hào)單片機(jī)和SPWM波信號(hào)發(fā)生器SA4828組成一種結(jié)搆簡(jiǎn)單、成本低、功能較好的變頻控制器。
雙語(yǔ)例句
詞組短語(yǔ)
- variable standard costing 變動(dòng)標(biāo)準(zhǔn)成本計(jì)算
- haha variable costing 變動(dòng)成本法
- variable costing approach 變動(dòng)成本法
- variable costing ratio 變動(dòng)成本比率
- standard variable costing 標(biāo)準(zhǔn)變動(dòng)成本計(jì)算法
短語(yǔ)
專業(yè)釋義
- 變動(dòng)成本計(jì)算
- 可變成本計(jì)算
- 變動(dòng)成本法
- 變動(dòng)成本計(jì)算法